THIRD DIVISION
G.R. No. 232870, June 03, 2019
MANUEL G. ACOSTA, PETITIONER, v. MATIERE SAS AND PHILIPPE GOUVARY, RESPONDENTS.
D E C I S I O N
LEONEN, J.:
In redundancy, an employer must show that it applied fair and reasonable criteria in determining what positions have to be declared redundant. Otherwise, it will be held liable for illegally dismissing the employee affected by the redundancy.
This Court resolves a Petition for Review on Certiorari1 assailing the April 7, 2017 Decision2 and July 12, 2017 Resolution3 of the Court of Appeals in CA-G.R. SP No. 140108.4 The Court of Appeals upheld the January 30, 2015 Decision5 and February 27, 2015 Resolution6 of the National Labor Relations Commission, which had reversed and set aside the Labor Arbiter's August 18, 2014 Decision7 holding petitioner Manuel G. Acosta's (Acosta) dismissal illegal.
Matiere SAS is a French company "engaged m the fabrication, supply[,] and delivery of unibridges and flyovers[.]"8
On October 29, 2008, Matiere SAS and the Department of Public Works and Highways executed a contract for the construction of flyovers and bridges.9 On March 19, 2009, Matiere SAS also entered into a contract with the Department of Agrarian Reform to construct bridges for better access to agricultural lands.10
On November 1, 2009, Matiere SAS, represented by its resident manager Philippe Gouvary (Gouvary), executed a Consulting Agreement11 with Acosta. Per the agreement, Matiere SAS engaged Acosta as its technical consultant for 12 months, with a monthly salary of P70,000.00.12 Upon the Consulting Agreement's expiration, Matiere SAS hired Acosta as its technical assistant with the same P70,000.00 monthly salary.13
Under the Employment Agreement14 dated November 1, 2010, Acosta was tasked to:
On December 14, 2011, Matiere SAS wrote Acosta a letter,16 increasing his salary from P70,000.00 to P76,000.00, effective January 1, 2012. On the same day, Matiere SAS wrote Acosta another letter,17 giving him a bonus of P30,000.00 for his good performance in the second half of 2011.18
- Prepare reports regarding WCI [Woodfields Consultants, Inc.] consultants.
- Be the intermediary between the CAD operators in WCI and the management in the office.
- Attend coordination meetings with consultant.
- Evaluate billings.
- Follow the SIT and prepare reports.
- Prepare various reports as required by the resident manager.
- Site visits.15
We have to inform you that your employment contract within the company MATIERE/EIFFAGE will end July 31, 2013.In a June 26, 2013 letter,22 Matiere SAS informed the Department of Labor and Employment that because its last shipment had been delivered,23 it would have to terminate the employment of its five (5) workers: Wilson G. Comia (Wilson), Richard E. Comia (Richard), Alexander M. Menor (Menor), Alvin P. Roselim (Roselim), and Acosta. Matiere SAS stated that Wilson, Richard, and Menor were all based in Subic, while Roselim was based in Cagayan de Oro.24 All four (4) of them were "assigned to the stripping operations[.]"25 Meanwhile, Acosta, who was based in the office, was "primarily in charge [of] the monitoring of shipments."26
This decision is due to the cessation of our delivery operations and the diminution of our activities. We cannot find any reinstatement at the office. Nevertheless[,] we would like to thank you for your cooperation since the 01, November 2009.
You are authorized not to report at the office starting July 1, 2013.
Regarding the calculation of your separation pay, we will signify you the amount as soon as possible.21
[I]f there are employees who should be affected by the reduction of workforce due to completion of deliveries, the field engineers in-charge of deliveries in the projects, and who supervised the stripping works/removing the unibridges parts from the container vans, may be the first ones to go. These field engineers, however, are undisputedly retained by respondents.The dispositive portion of the Labor Arbiter's Decision read:
. . . While Alvin Roselim is a forklift operator, [Wilson, Richard, and Menor] are helpers who work under the supervision of field engineers. The latter were the ones in charge of deliveries and respondents may have had reasons to terminate them on [the] ground of redundancy. As a Technical Assistant whose duties include monitoring of projects until completion, there is no substantial basis why complainant was also affected by respondents' redundancy plan.39
WHEREFORE, foregoing considered, complainant is hereby found to have been illegally dismissed. Respondent Matiere SAS is hereby ordered to pay complainant separation pay with backwages totaling Php241,793.62, inclusive of attorney's fees.Both parties appealed the Labor Arbiter's Decision before the National Labor Relations Commission.41 Praying that the award be modified to P1,846,389.44, Acosta argued in his Partial Memorandum of Appeal42 that the computation of the Labor Arbiter's award should be based on his monthly salary before his employment termination, which was P78,280.00.43 Meanwhile, in their Memorandum of Appeal,44 Matiere SAS and Gouvary contended that Acosta's employment termination was valid and that they implemented the redundancy based on fair and reasonable criteria.45
Other claims are dismissed for lack of basis.
SO ORDERED.40 (Emphasis in the original)
WHEREFORE, premises considered, the appeal of respondents Matiere SAS and Philippe Gouvary is GRANTED and the assailed Decision of the Labor Arbiter dated August 18, 2014 is REVERSED and SET ASIDE. Accordingly, the instant complaint for illegal dismissal is hereby DISMISSED for lack of merit.Acosta moved for reconsideration.52 He submitted a certification53 from Woodfields Consultants, Inc. and a certification54 from the Department of Public Works and Highways to support his claim that his task was not limited to monitoring shipments. He also alleged that Matiere SAS hired a certain Charlie Desamito as his replacement.55
The Partial Appeal of complainant-appellant Manuel G. Acosta is DENIED.
SO ORDERED.51 (Emphasis in the original)
IN VIEW OF THE FOREGOING, complainant's motion for reconsideration is partially granted and the dispositive portion of Our decision dated January 30, 2015 is hereby amended to read as follows:Thus, Acosta filed before the Court of Appeals a Petition for Certiorari.58"WHEREFORE, premises considered, the appeal of respondents [Matiere] SAS and Philippe Gouvary is GRANTED and the assailed Decision of the Labor Arbiter dated August 18, 2014 is REVERSED and SET ASIDE. Accordingly, the instant complaint for illegal dismissal is hereby DISMISSED for lack of merit.SO ORDERED.57 (Emphasis in the original)
Respondent-appellants are, however, ordered to pay complainant-appellant Manuel G. Acosta separation pay as provided by law.
The Partial Appeal of complainant-appellant Manuel G. Acosta is DENIED."
Even assuming that Acosta's functions included reporting and coordination, he completely failed to show that these particular functions were not incidental only to the supply and delivery of the bridges. Acosta does not dispute the completion of the shipments for the covered projects. Neither did he ever dispute that the DPWH and the DAR projects were Matiere's only activities locally. It follows clearly that with the completion of the shipments, Acosta's role became unnecessary. Despite the continuation of installation and erection of the bridges, Acosta cannot pretend any involvement in such activities. His task was indubitably office- and table-bound and not field work.61Acosta moved for reconsideration, but his Motion was denied by the Court of Appeals in its July 12, 2017 Resolution.62
The supply contract of the Respondents could not have ended up upon completion of delivery. The supply contract satisfies only the delivery of the Supply of Bridging Material. The design, technical supervision during the erection, installation and commissioning were still ongoing and to be completed in 2016. Petitioner checks on the designs of the Design Consultants, coordinate[s] with them, evaluate[s] their billings. Such activities were still ongoing when the Petitioner was terminated.In their Comment,67 respondents insist that they sufficiently established that petitioner's position was already redundant.68 They cite the certifications from the Department of Agrarian Reform and the Department of Public Works and Highways to prove that "there was a significant diminution in the volume of materials business."69 Claiming that the completion of the shipments rendered petitioner's position irrelevant, they argue that he failed to prove that his other tasks were not merely incidental to his main function. Thus, they were left with no choice but to legally dismiss him.70
It is important to note that contracts of the Respondents they entered with the DPWH and DAR comprise of the following:Beyond completeness of the delivery of bridging materials to the projects, other aspects of the contracts have to be accomplished. The actual approved accomplishment for the design of DAR Bridges alone as of June 2013 was only 16%, or 68 out of 418 bridges. Petitioner then was still doing the checking, coordinating with the consultants and certifying billings of Woodfields Consultants, Inc[.] and Design Sciences, Inc. He could have continued doing his assign[ed] tasks if not for his untimely and unjustified termination.66 (Citation omitted)
- Supply of Bridging Materials.
- Supply of Goods for the design, manufacture and delivery of modular steel unibridges.
- Supply of Technical Advise / Services and Materials.
- As well as variable services within the maximum provision for installation and commissioning of the Bridges.
ARTICLE 298. [283] Closure of Establishment and Reduction of Personnel. - The employer may also terminate the employment of any employee due to the installation of labor-saving devices, redundancy, retrenchment to prevent losses or the closing or cessation of operation of the establishment or undertaking unless the closing is for the purpose of circumventing the provisions of this Title, by serving a written notice on the workers and the Ministry of Labor and Employment at least one (1) month before the intended date thereof. In case of termination due to the installation of labor-saving devices or redundancy, the worker affected thereby shall be entitled to a separation pay equivalent to at least his one (1) month pay or to at least one (1) month pay for every year of service, whichever is higher. In case of retrenchment to prevent losses and in cases of closures or cessation of operations of establishment or undertaking not due to serious business losses or financial reverses, the separation pay shall be equivalent to one (1) month pay or at least one-half (1/2) month pay for every year of service, whichever is higher. A fraction of at least six (6) months shall be considered one (1) whole year. (Emphasis supplied)In Wiltshire File Company, Inc. v. National Labor Relations Commission,74 this Court explained:
[R]edundancy, for purposes of our Labor Code, exists where the services of an employee are in excess of what is reasonably demanded by the actual requirements of the enterprise. Succinctly put, a position is redundant where it is superfluous, and superfluity of a position or positions may be the outcome of a number of factors, such as overhiring of workers, decreased volume of business, or dropping of a particular product line or service activity previously manufactured or undertaken by the enterprise. The employer has no legal obligation to keep in its payroll more employees than are necessary for the operation of its business.75 (Emphasis supplied, citation omitted)The requirements for a valid redundancy program were laid down in Asian Alcohol Corporation v. National Labor Relations Commission:76
For the implementation of a redundancy program to be valid, the employer must comply with the following requisites: (1) written notice served on both the employees and the Department of Labor and Employment at least one month prior to the intended date of retrenchment; (2) payment of separation pay equivalent to at least one month pay or at least one month pay for every year of service, whichever is higher; (3) good faith in abolishing the redundant positions; and (4) fair and reasonable criteria in ascertaining what positions are to be declared redundant and accordingly abolished.77 (Citations omitted)Assuming that respondents can declare some positions redundant due to the alleged decrease in volume of their business, they still had to comply with the above-cited requisites. This, they failed to do.
Dear Mr Acosta:Under Schedule "A," petitioner's job description listed his tasks as a technical assistant:
In connection with your position as Technical Assistant, please be informed that you are subject to the following terms and condition:
- . . . .
- The Employee shall be employed in the capacity of Technical Assistant, the current duties and responsibilities of which are set out in Schedule "A" annexed hereto and forming part of this agreement. These duties and responsibilities may be amended from time to time in the sole discretion of the Employer, subject to formal notification of same being provided to the Employee.81 (Emphasis in the original)
There was no mention of monitoring shipments as part of petitioner's tasks. If his work pertains mainly to the delivery of supplies, it should have been specifically stated in his job description. Respondents did not even present any evidence to support their claim or to contradict petitioner's documentary evidence. There was, hence:, no basis for respondents to consider his position irrelevant when the shipments had been completed.
- Prepare reports regarding WCI [Woodfields Consultants, Inc.] consultants.
- Be the intermediary between the CAD operators in WCI and the management in the office.
- Attend coordination meetings with consultant.
- Evaluate billings.
- Follow the SIT and prepare reports.
- Prepare various reports as required by the resident manager.
- Site visits.82
Very truly yours, (SGD) WILFREDO V. LAPITAN Division Clerk of Court |
Endnotes:
1Rollo, pp. 27-50. Filed under Rule 45 of the Rules of Court.
2 Id. at 52-62. The Decision was penned by Associate Justice Maria Filomena D. Singh, and concurred in by Associate Justices Ricardo R. Rosario and Edwin D. Sorongon of the Fifteenth Division, Court of Appeals, Manila.
3 Id. at 64-65. The Resolution was penned by Associate Justice Maria Filomena D. Singh, and concurred in by Associate Justices Ricardo R. Rosario and Edwin D. Sorongon of the Fifteenth Division, Court of Appeals, Manila.
4 Id. at 44.
5 Id. at 522-532. The Decision was penned by Commissioner Mercedes R. Posada-Lacap, and concurred in by Presiding Commissioner Grace E. Maniquiz-Tan and Commissioner Dolores M. Peralta-Beley of the Fifth Division, National Labor Relations Commission, Quezon City.
6 Id. at 549-552. The Resolution was penned by Commissioner Mercedes R. Posada-Lacap, and concurred in by Presiding Commissioner Grace E. Maniquiz-Tan and Commissioner Dolores M. Peralta-Beley of the Fifth Division, National Labor Relations Commission, Quezon City.
7 Id. at 311-319. The Decision was penned by Labor Arbiter Vivian H. Magsino-Gonzalez of the National Labor Relations Commission, Quezon City.
8 Id. at 53.
9 Id.
10 Id.
11 Id. at 97-100.
12 Id. at 53 and 98-99.
13 Id. at 53 and 101.
14 Id. at 101-102.
15 Id. at 53 and 103.
16 Id. at 104.
17 Id. at 105.
18 Id. at 54.
19 Id. at 106.
20 Id.
21 Id. at 54 and 106.
22 Id. at 133.
23 Id.
24 Id. at 54 and 135.
25 Id. at 133.
26 Id.
27 Id. at 134.
28 Id. at 135.
29 Id. at 54 and 134.
30 Id. at 86-89.
31 Id. at 54-55.
32 Id. at 55 and 311.
33 Id. at 136.
34 Id. at 529.
35 Id. at 311-319.
36 Id. at 315-316.
37 Id. at 316.
38 Id.
39 Id. at 316-317.
40 Id. at 319.
41 Id. at 55.
42 Id. at 320-325.
43 Id. at 323-324.
44 Id. at 336-350.
45 Id. at 344-347.
46 Id. at 522-532.
47 Id. at 55 and 532.
48 Id. at 529.
49 Id. at 530-531.
50 Id. at 531.
51 Id. at 532.
52 Id. at 533-545.
53 Id. at 547. Woodfields Consultants, Inc. is a firm composed of planners, architects, engineers, construction managers, and environment specialists. It was contracted by Matiere SAS for the design of the bridges' sub-structures under their supply contract with the Department of Public Works and Highways.
54 Id. at 546.
55 Id. at 538 and 541.
56 Id. at 549-552.
57 Id. at 551-552.
58 Id. at 66-85.
59 Id. at 52-62.
60 Id. at 58.
61 Id. at 58-59.
62 Id. at 64-65.
63 Id. at 27-50.
64 Id. at 38.
65 Id. at 39-43.
66 Id. at 43.
67 Id. at 734-738.
68 Id. at 735.
69 Id.
70 Id. at 736.
71 Id.
72 Id.
73Manggagawa ng Komunikasyon sa Pilipinas v. Philippine Long Distance Telephone Company, Inc., 809 Phil. 106, 122 (2017) [Per J. Leonen, Second Division].
74 271 Phil. 694 (1991) [Per J. Feliciano, Third Division].
75 Id. at 703.
76 364 Phil. 912 ( 1999) [Per J. Puno, Second Division].
77 Id. at 930.
78 Petitioner received the "Ending of the employment agreement" letter from respondents on June 27, 2013 (rollo, p. 132), while the Department of Labor and Employment received the Establishment Employment Report from respondents on June 28, 2013 (rollo, p. 134).
79Rollo, p. 136.
80Manggagawa ng Komunikasyon sa Pilipinas v. Philippine Long Distance Telephone Company, Inc., 809 Phil. 106, 123 (2017) [Per J. Leonen, Second Division].
81Rollo, p. 101.
82 Id. at 53 and 103.
83 346 Phil. 30 (1997) [Per J. Romero, Third Division].
84 Id. at 35.
85Nacar v. Gallery Frames, 716 Phil. 267 (2013) [Per J. Peralta, En Banc].